Download the checklist here!
Report:
- Form1
- Sign and date boxes 19 and 20
- Form2
- Material lot number under box 10 on the same line as the material type
- Finishing CoC number under box 10 on the same line as the finishing type
- Sign and date boxes 14 and 15
- Sample Reports
- Material type and lot number at the top of the form
- Results Column
- Tooling information – This includes the tool type, tool ID number, and calibration due date
- Sign and date bottom of form
- Report is on the Xometry supplied Excel form
- Reports are typed not handwritten
- All sample reports are filled out
- Parts are tagged to show what part goes with what sample number report
CoC:
- Material Type and exact temper used
- Material Lot number
- Printed name, signed and dated
Material Certs:
- Full traceability if required(Mill cert, package slip from mill to reseller, package slip from reseller to your company. Also include a CoC with your company letter head to Xometry as the customer)
- Type and temper used that was required
- Material specs used that was required
Finishing Cert:
- Finishing type used that was required
- Finishing type used that was required
Hardware Certs
- Hardware used that was required
Pictures:
- General picture of the finished part
- Close up, clear picture of all faces (sides) of the part (The image should take up the full frame at the camera’s lowest zoom setting, not blurry and in good lighting)
- Picture of any surface finish callouts from the print
- Picture of any required part markings
- Picture of the samples tagged
- Picture of any bag and tag requirements
- Picture of any hardware installed
Uploaded to portal:
- Report
- All pictures
- CoC
- Material certs
- Finishing certs
- Hardware certs
- Inspection report, bubbled print, CoC, Material cert, Finishing cert, and Hardware certs printed and packaged with the parts.