Download the checklist here!
Report:
- Is the report on the Xometry supplied Excel form
- Is the report typed
- Material type / Lot number filled out at the top of the form
- Results filled out and all in tolerance
- Tooling information (including tooling type, ID number, and calibration due date) filled out
- Report signed and dated
- All sample report forms filled out
- Are the parts tagged to show what part was used to achieve the results from which report
CoC:
- Material Type and exact temper used
- Material Lot number
- Printed name, signed and dated
Material Certs:
- Full traceability if required(Mill cert, package slip from mill to reseller, package slip from reseller to your company. Also include a CoC with your company letter head to Xometry as the customer)
- Type and temper used that was required
- Material specs used that was required
Finishing Cert:
- Finishing type used that was required
- Finishing specs used that was required
Hardware Certs:
- Hardware used that was required
Pictures:
- General picture of the finished part
- Close up, clear picture of all faces (sides) of the part (The image should take up the full frame at the camera's lowest zoom setting, not be blurry and in good lighting)
- Picture of any surface finish callouts from the print
- Picture of any required part markings
- Picture of the sample tagged
- Picture of any bag and tag requirements
- Picture of any hardware installed
Uploaded to portal:
- Uploaded to portal
- All pictures
- CoC
- Material Certs
- Finishing Certs
- Hardware Certs
- Inspection report, Bubbled print, CoC, Material certs, Finishing certs, and Hardware certs printed out and packaged with the parts.