The Standard Inspection reporting above does not apply. Instead, do the following for Standard Inspection documentation:
- If a print is provided, redline it with inspection results for critical features. Upload this print and the completed Xometry Inspection Checklist to the Portal
- If there is no print provided, choose and then verify that critical features are conforming. You will then only need to complete and then upload the Xometry Checklist to the Portal